多益Operations · 5 minCEFR B2
Crisis at the Warehouse
by Evelyn Park · Apr 2026
At 2 a.m., the night-shift called: a sprinkler in Aisle 14 had burst, soaking three of . Each pallet was worth nearly a hundred thousand dollars.
By 3 a.m., I was on-site with the claims and a restoration crew. The damage would not be finalized for days, but the immediate priority was containment. We moved dry out, blocked the aisle, and filed an report.
When the CEO arrived at dawn, his first question was not about cost, but about people. "Was anyone hurt?" he asked. Nobody was. Everything else, he said, is .